Institutional
Cathedral of the Basilica
Covington, KY
HGC completed all the concrete, carpentry, and specialty work
on this national treasure for the project CM. Work included a new
concrete alter. redesigned baptismal font and custom millwork.
HGC pre-fabricated two bell tower structures at our facility and
then set in place by crane on site. A fall protection system was
installed around the clerestory to keep maintenance workers safe
from injury.
KZF, Architect |